Production
Articles relating to Issues and queries around Production
FactoryMaster: Miscalculation from op time manufacturing routeThe average op time calculation is incorrect. In the ’Route Time Calculation’ menu, on the ’Routes’ screen the ’Average Time’ rounded up and the calculated ’New Op Time’ wrong. The…
FactoryMaster: Set how many items need to be worked on to make one finished item on the routeWe are expecting to make 500 items but the planned quantity is 100000.
Changing the Raw Material inspection level of a batch after it was receivedThis article provides you with information relating to changing the Raw Material inspection level after it was received.
