FactoryMaster: By-Product costs are not being deducted in the Standard Cost of a MA PartOur MA Parts are not deducting the By-Product cost from the Standard Cost.
Percentages Applicable is displaying 110%We have noticed that the Percentages Applicable within Job Costing is showing as 110%, how is this possible?
Rework costs appearing in the Job Costing window but not appearing on the printed report for ProjectsWhen printing Job Costing for Projects, Rework Costs appear in the Job Costing screen but not in the report, why is this?
Standard Costs setup and usageHow are Standard Costs set up and how can they be reviewed?
I cannot recalculate standard costs for a part, due to a zero charge.
The Timesheet Cost of Booking is duplicatingI have a resource with a rate of £36 per hour however the Cost of Booking in the Time Bookings is displaying this as £72.
Job costing discrepancies that require recalculatingHow do I recalculate job costings for works orders?
Making a BI part that is sold straight through appear on a projects job costingI have a project for which I sell BI parts straight through at a mark up, how can I make these appear on the job costing for a project.
Planned Costs for Sub-Level parts are not appearing in Job CostingMy planned costs in Job Costing is zero for one works order, why is this?