Planned Costs for Sub-Level parts are not appearing in Job Costing

My planned costs in Job Costing is zero for one works order, why is this?

Written by Jes

If your Planned Costs for Manufactured Parts are displaying as Β£0.00 it is possible that no Standard Cost has been set up for them. It is also possible that the MA Parts were added to the Works Order before a Standard Cost was allocated to them.