Please check that your Works Order contains a Raw Material part as the Cost Material field is pulled from Raw Materials and not Bought In / Manufactured Parts.
£0.00 in the Cost Material field for Stock Valuation
When booking in a works order i have £0.00 in the Cost Material section for Stock Valuation, why is this?
B
Written by Bogdan Branetiu
Updated this week