It's not possible to link two Operations together so that the second operation starts instantly after the first Op.
Is it possible to link two operations together so that they are always scheduled at the same time?
We have an operation for cleaning our tools and they must be used after. These two operations are listed separately and not linked together. When scheduled they have a two-hour gap, is it possible for the system to schedule these two OPs together?
B
Written by Booghy