Unfortunately, you can't have a Sub-Con with a resource rate of £0.00. If you would like the resource to have a zero value you need to leave the resource rate blank.
Is it possible to have a Sub-Con resource with a rate of £0.00?
We would like to put a rate of £0.00 on one of our Sub-Con resource, is this possible?
J
Written by Jes Foxall-Beckley
Updated over 3 weeks ago