Production
Articles relating to Issues and queries around Production
By Arthur1 author5 articles
- Changing the Raw Material inspection level of a batch after it was receivedThis article provides you with information relating to changing the Raw Material inspection level after it was received.
- FactoryMaster: Set how many items need to be worked on to make one finished item on the routeWe are expecting to make 500 items but the planned quantity is 100000.
- FactoryMaster: Miscalculation from op time manufacturing routeThe average op time calculation is incorrect. In the ’Route Time Calculation’ menu, on the ’Routes’ screen the ’Average Time’ rounded up and the calculated ’New Op Time’ wrong. The…
- How to enable the Specify Serial Numbers optionHow to switch on the serial numbers in subcon? The option is greyed out.
- Ways to deal with multiple drawings of parts on one drawingWe are looking for advice on easy ways to deal in Factory Master when there are different issue numbers between the drawing and the part. We have a customer with…
