The functionality has been enhanced in FactoryMaster sub-release 20.14.08. Please upgrade to this version or above.
FactoryMaster: When the actual time was zero then the report should shows 0% if there is a planned time
I run the actual vs planned time costs analysis report but when the Actual time was zero then the report should show -100%, because there is a Planned time. It actually shows 0%.
Written by Sebastian Pavel Rus